Blog

Manténgase al día con lo último y lo mejor, Raptor tiene para ofrecer mensajes de los empleados en línea, CISC actualizaciones y actualizaciones tecnológicas.
Desplácese hacia abajo para informarse.

994K Wheel Loader GET Stands

January 29, 2026

Engineered, manufactured and built TOUGH 💪 by Raptor. Keep your Ground Engaging Tools organized and ready for easy Installation with Raptor GET stands. Email raptor@raptormining.com for all GET stand options.


RAPTOR - HEAVY DUTY Drill Masts

January 27, 2026

HEAVY DUTY Drill Masts, engineered, designed and built TOUGH by Raptor. Raptor approved ✅, with Raptor Core Values in every fabrication; PEOPLE, SAFETY, QUALITY & VELOCITY.


HarderPlate® by Raptor

January 26, 2026

HarderPlate® 400bhn, 450bhn & 500bhn hardness (AR) Abrasion Resistant Steel, by Raptor. Mining, quarry, buckets, liners, truck bodies for all makes and models of equipment. Laser Scanned by Raptor for a perfect fit. In stock in Edmonton, Barrie, Salt Lake City, Arequipa and Belo Horizonte. …


Ripper goes Jurassic

January 21, 2026

When the rock is prehistoric, the Ripper goes Jurassic. raptor@raptormining.com for engineered, designed and built Raptor tough.


Raptor tough fabricated ears

January 20, 2026

Raptor tough fabricated ears for the worlds largest Hydraulic Mining Shovel Buckets. Engineered, Manufactured, Tested and Proven in prehistoric rock mines.



Chrome Carbide Top Mounted Wear Plates

January 15, 2026

950, 988 and more Wheel Loader CCO RaptorPlate® Top Mounted Wear Plates for those TOUGH digging conditions. In stock at Raptor Edmonton, Barrie, Salt Lake City, Arequipa and more. raptor@raptormining.com


Building JURASSIC sized Dredging Buckets and Rippers

January 14, 2026

Building JURASSIC sized Dredging Buckets and Rippers for a 3000 HP, 1,500,000 lb Hydraulic Excavator is no easy task. Leave it to the PRO's at Raptor Mining to get the job done. SAFETY, QUALITY & VELOCITY, is job 1, 2 and 3 at Raptor. GSD 👊, raptor@raptormining.com


Jurassic sized Mining Shovel and for an Awesome Customer!

January 13, 2026

Super PRO work Raptor Mining - Salt Lake City, Utah Salt Lake City team! Laser scanned perfect fitting RaptorPlate® CCO Chrome Carbide Plate ready to GSD on a Jurassic sized Mining Shovel and for an Awesome Customer! There's only 1 RaptorPlate®, GSD 👊


What an awesome 10 years Raptor CMO

January 12, 2026

Celebrating 10 Years of the Raptor CMO. The Chief Marketing Officer at Raptor, 2016 - 2026, 10 years of GSD and working with all the teams at Raptor Edmonton, Barrie, Miami, Salt Lake City, Arequipa and Belo Horizonte. What an awesome 10 years Raptor CMO and looking forward to another 10 million…